The decorative layer of exterior wall insulation materials is usually coated with paint, which is unstable and subject to many uncertain factors, often resulting in fading, peeling, hollowing, and other problems. However, foam ceramic extruded boards are not affected, and changing to a different decorative material can effectively avoid them.
External wall insulation material extruded board manufacturers mainly use special processes to continuously extrude and foam hard boards during the production process, which have a wide range of applications in structural engineering. In short, strict protective measures must be taken during the construction process, and all wires need to be properly clamped. This can effectively improve the construction efficiency of extruded boards and quickly identify the cause in case of problems.
The flatness of the exterior wall engineering meets the material requirements for acceptance, the installation of exterior doors and windows is completed, and it has been inspected and accepted by relevant departments as qualified. During the operation of hanging and pasting extruded plastic boards, the ambient temperature should not be lower than 5 degrees Celsius, and anti freezing measures must be taken for winter construction adhesives.
The graphite foam layer material of external wall insulation material can effectively protect the foam structure in the layer. Again, it has excellent thermal insulation performance and low thermal conductivity, making it an excellent material for insulation and heat preservation. Extruded polystyrene board has a wide range of applications, complete material matching, simple and reasonable technology, and can meet the energy-saving construction requirements of buildings in most regions of China under different climatic conditions.
To determine the suitability of an external wall insulation material for building construction projects, it is necessary to consider it from a technical perspective, and there are strict requirements for the performance of Shandong extruded polystyrene board manufacturers. The construction site should be connected to water and electricity, and the cleanliness of the working environment should be maintained. After the construction and inspection of the sloping roof are completed, the cement mortar leveling should be completed before the construction of the roof insulation system and reach dry hardening.