国产亚洲欧美在线中文_日韩高清亚洲二区中文字幕_中文字幕在线看看_国产特黄观看视频_中文字幕精品无码—人妻熟_日韩精品欧美一区国产_日韩欧美另类一区在线_成人电影AV在线_亚洲熟妇熟女久久精品_一级欧美牲交大片

Industry TrendsABOUT US
Eight precautions for integrated insulation and decoration panels
2021-07-27

1. Due to the wall not reaching the required level, it is necessary to first grind and paste the insulation and decoration integrated board (such as EPS board) to ensure the flatness of the wall, and then perform a second polishing before the benzene board is firmly attached. After hanging the net, it should be adhered smoothly.


The gap between the integrated insulation and decoration board must be filled with half a strip. The strip cannot be bonded, let alone filled with adhesive.


3. The internal and external corners and outer wall surfaces do not need to be vertical, but they must be straight and have no obvious bending angles.


4. The integrated insulation and decoration board for the corners of doors and windows should be cut from the entire polystyrene board and should not be spliced together.


After the completion of the insulation and decoration integrated board, it should be left to stand for at least 24 hours before grinding to prevent the polystyrene board from moving and weakening the bonding strength between the board and the basement wall.


6. Who is responsible for implementing the safety, quality, and schedule management system for construction.


7. Grid layout for reinforcing doors and windows


8. The top of the window is used as a drip line, and the bottom of the window is used as a slope water. The drainage holes at the bottom of the window frame should not be blocked to ensure proper drainage.